Southampton Project

StrutFoot® originally supplied a HD frame to support a large AHU on the project. We were then asked to quote, design and install a bespoke platform and three bespoke Stepovers for a project in Southampton.

The client sent us all the technical information regarding requirements for the access; e.g. dimensions and clearance required.
We managed to get all the access manufactured, galvanised, delivered and installed within 23 days.

Share This Case Study

Testimonials

It’s not often you come across a company who genuinely care, having dealt with Steve & Malc at Strutfoot for a number of years, I have found them to be very proactive and helpful in their attitude. Their response times and indeed their product range have allowed us to gain many prestigious contracts.

MM
Working hands in hands with such a fine company as Strutdirect is a real pleasure and doing business in such a nice and trustful way is something we would wish everybody.
Working over the years with a partner such as Strudirect has not only enable us to deepen our knowledge regarding support structure but also give us the opportunity to sell more products throughout our existing customer base.
François Xavier Gohy- Climatech
We’ve had the pleasure of working with Strutfoot Ltd across multiple projects and can confidently say their service and product quality are second to none. Their team is highly professional, responsive, and always willing to go the extra mile to ensure everything runs smoothly.

The reliability of their systems and the efficiency of their support have made them a trusted partner for Cool Solutions Distribution Ltd. We value their consistency, attention to detail, and commitment to delivering on time — all of which make a real difference in our operations.

From the initial design of a project through to the ordering of the systems, Strutfoot are always looking to go a step further with their assistance.

We look forward to continuing our strong working relationship with Strutfoot Ltd and wouldn’t hesitate to recommend them to others in the industry.

Cool Solutions Distribution Ltd

continue reading

Related Posts

  • 130 words0.7 min read

    StrutFoot® were tasked with designing roof top supports for AHU’s, chillers and ductwork for a project in London. The client issued us with the drawings and technical specifications for the project. Following a site survey we were able to offer a cost effective solution, designed, engineered and delivered to site in 5 working days to site.

  • 99 words0.5 min read

    StrutFoot® were tasked with designing and delivering a bespoke AHU frame to Gateshead metro centre in 3 days, quite a tall order when the product requires manufacturing, galvanising and delivering to the site.

  • 100 words0.5 min read

    StrutFoot® were asked to complete a site survey to design and install a bespoke access to fit around an AHU unit at Queen’s Medical Centre and also to supply a StrutFoot® frame for an AHU going on the roof. After the client was happy with the design our team started to manufacture and galvanise the access.