StrutFoot® were tasked with designing roof top supports for AHU’s, chillers and ductwork for a project in London. The client issued us with the drawings and technical specifications for the project. Following a site survey we were able to offer a cost effective solution, designed, engineered and delivered to site in 5 working days to site.
StrutFoot® originally supplied a HD frame to support a large AHU on the project. We were then asked to quote, design and install a bespoke platform and three bespoke Stepovers for a project in Southampton.
StrutFoot® were tasked with designing and delivering a bespoke AHU frame to Gateshead metro centre in 3 days, quite a tall order when the product requires manufacturing, galvanising and delivering to the site.
StrutFoot® were asked to complete a site survey to design and install a bespoke access to fit around an AHU unit at Queen’s Medical Centre and also to supply a StrutFoot® frame for an AHU going on the roof. After the client was happy with the design our team started to manufacture and galvanise the access.
Case Studiesadmin2025-11-13T10:32:28+00:00